Architecture & ADUs · Cost guide 2026

ADU and Architect Costs in 2026: Design Fees, ADU Build Prices and Approval Rules

What architects charge for homes, additions and ADUs, what it costs to build each type of ADU, and how approvals work, including California's 60-day rule.

By the GOLDGCP editorial team · Updated · 7 min read

Get a free quoteSee prices

An architect sketching over house blueprints
Photo: Ron Lach / Pexels

How much an architect and an ADU cost

Quick answer

An architect for a residential project in the US usually charges 5% to 20% of construction costs, or $5,000 to $60,000 for a typical home design, according to HomeGuide. Building an accessory dwelling unit (ADU), a small second home on the same lot, costs about $100 to $300 per square foot. For a 600-square-foot ADU, that means roughly $48,000 to $96,000 for a prefab unit, $75,000 to $135,000 for an attached unit, and $90,000 to $150,000 for a detached backyard cottage.

3D illustration: Architect desk with drawings and a model
3D illustration: Backyard ADU beside a main house
JobUS average (typical range)Typical
Architect fees, ADU (600 sq ft)$4,800–$10,800$7,200
Architect fees, addition (500 sq ft)$3,000–$7,500$5,000
Architect fees, new home (2,500 sq ft)$4,000–$30,000$11,000
3D rendering package$800–$3,200$1,600
Prefab ADU, 600 sq ft, built$48,000–$96,000$72,000
Garage conversion ADU, 600 sq ft$30,000–$120,000$75,000
Attached ADU, 600 sq ft$75,000–$135,000$105,000
Detached ADU, 600 sq ft$90,000–$150,000$120,000
ADU above a garage, 600 sq ft$120,000–$300,000$210,000
Land survey$400–$1,800$1,000

US national averages for 2026, labor and standard materials included, from published cost guides (sources at the end of this page). Local prices differ: see the city table below, or enter your ZIP code in the cost estimator.

How architects charge

Fee typeTypical national range
Percentage of construction cost5% to 20% for homes, remodels and additions
Hourly$100 to $250, up to $350 for a firm principal
Per square foot$2 to $15
Drawings for permits (builder's set)$2,000 to $20,000
Full service, design through construction$15,000 to $80,000+
3D renderings$200 to $800 per image

The fee follows the scope. Most cities need at least a permit set of drawings before they issue a building permit. Full service adds design options, detailed construction documents, help choosing a builder, and site visits during construction to check the work matches the plans.

Find an architect near you

Enter your ZIP code to see local prices and get matched with GOLDGCP's in-house architects or a vetted design professional near you. GOLDGCP works in every US ZIP code. See our architecture services for how our team works.

ADU costs in 50 US metros

This table prices a 600-square-foot detached ADU, built, in each of the 50 largest US metros, using each metro's construction cost factor. Local ADU rules vary even more than prices, so check your city before planning.

MetroCost factorDetached ADU, 600 sq ft, built
New York1.31$117,900–$196,500
San Francisco Bay Area1.28$115,200–$192,000
San Jose1.28$115,200–$192,000
Boston1.23$110,700–$184,500
Chicago1.20$108,000–$180,000
San Diego1.19$107,100–$178,500
Sacramento1.17$105,300–$175,500
Philadelphia1.15$103,500–$172,500
Seattle1.15$103,500–$172,500
Providence1.15$103,500–$172,500
Los Angeles1.14$102,600–$171,000
Detroit1.13$101,700–$169,500
Riverside–San Bernardino1.11$99,900–$166,500
Portland1.10$99,000–$165,000
Las Vegas1.10$99,000–$165,000
Milwaukee1.10$99,000–$165,000
Hartford1.10$99,000–$165,000
Minneapolis–St. Paul1.06$95,400–$159,000
Pittsburgh1.06$95,400–$159,000
Denver1.05$94,500–$157,500
Washington DC1.04$93,600–$156,000
St. Louis1.04$93,600–$156,000
Cincinnati1.02$91,800–$153,000
Salt Lake City0.99$89,100–$148,500
Orlando0.98$88,200–$147,000
Columbus0.98$88,200–$147,000
Cleveland0.98$88,200–$147,000
Baltimore0.96$86,400–$144,000
Kansas City0.96$86,400–$144,000
Jacksonville0.96$86,400–$144,000
Virginia Beach–Norfolk0.94$84,600–$141,000
Miami0.93$83,700–$139,500
Tampa0.93$83,700–$139,500
Indianapolis0.93$83,700–$139,500
Phoenix0.90$81,000–$135,000
Rochester0.90$81,000–$135,000
Oklahoma City0.89$80,100–$133,500
Buffalo0.89$80,100–$133,500
Nashville0.87$78,300–$130,500
Memphis0.87$78,300–$130,500
Richmond0.87$78,300–$130,500
Louisville0.86$77,400–$129,000
Birmingham0.86$77,400–$129,000
Atlanta0.85$76,500–$127,500
Charlotte0.85$76,500–$127,500
Raleigh–Durham0.85$76,500–$127,500
Dallas–Fort Worth0.84$75,600–$126,000
Houston0.82$73,800–$123,000
Austin0.82$73,800–$123,000
San Antonio0.80$72,000–$120,000

Cost factors from the U.S. Army Corps of Engineers Area Cost Factors (US average = 1.00). Outside these metros, the cost estimator uses your state's price level from the Bureau of Economic Analysis. Linked metros have a full local guide.

The same estimator has its own page, easy to share or bookmark: Architect fee estimator.

ADU types and costs

ADU typeCost per sq ft600 sq ft exampleGood to know
Basement conversion$50 to $100+Lowest cost if the space is dry and has headroomNeeds egress windows and moisture control
Garage conversion$50 to $200Uses an existing structureLoses parking; may need a new foundation or insulation
Prefab or modular$80 to $160$48,000 to $96,000Built in a factory; site work, foundation and utilities extra
Attached$125 to $225$75,000 to $135,000Shares a wall with the main house
Detached$150 to $250$90,000 to $150,000The most private; can exceed $250,000 with high-end finishes
Above a garage$200 to $500+Varies widelyNeeds structural work to carry a second story

Costs beyond construction

HomeGuide lists these extra costs for an ADU project:

  • House plans, $1,200 to $5,000
  • Land survey, $400 to $1,800
  • Site excavation for a foundation pad, $1,500 to $5,000
  • Utility connections for water, sewer and power, which vary with the distance to the main house and the street
  • Permit and impact fees, set locally

California ADU rules

California has made ADUs easier to build than almost any other US state. Under state law, as explained in the Department of Housing and Community Development's ADU Handbook, a city or county must approve or deny a complete ADU application within 60 days when there is an existing home on the lot. If it doesn't act in time, the application is deemed approved. The agency must also tell you within 15 business days whether your application is complete. Other states and cities are adopting similar rules, but requirements still differ widely, so confirm local zoning before design starts.

Additions versus ADUs

An addition expands the main house with more bedrooms, a bigger kitchen or a second story. An ADU is a separate unit with its own kitchen, bathroom and entrance. An ADU can bring in rent or house family members with some privacy. An addition gives you more space in your own home and usually adds more to its resale value as a single-family house. Both need an architect or designer and permits, and both are priced per square foot in a similar range.

What an architect does on a residential project

  1. Site and zoning review: what the lot and local rules allow you to build
  2. Schematic design: layouts and the basic form of the project
  3. Design development: materials, windows, structure and systems
  4. Construction documents: the permit set and the drawings contractors bid and build from
  5. Permitting: submitting plans and responding to city comments
  6. Construction support: answering builder questions and checking the work

In some states and for some project types, a licensed architect or engineer must stamp the drawings. For many single-family projects, a qualified designer can prepare permit drawings, with an engineer for structural calculations.

Steps to build an ADU

  1. Check zoning and ADU rules for your lot: size limits, setbacks, height, parking and owner-occupancy rules.
  2. Hire an architect or designer and survey the lot if needed.
  3. Design the unit and prepare the permit set, including structural and energy calculations.
  4. Submit for permits and respond to plan check comments.
  5. Hire a licensed builder or use a prefab manufacturer and installer.
  6. Build the foundation and connect utilities.
  7. Build or set the unit, finish the interior, and pass final inspection.

Most ADU projects take many months from design to move-in, with permitting and utility connections often taking as long as construction.

Prefab or site-built?

A prefab ADU is built in a factory and set on a foundation on your lot, which shortens time on site and can cost less per square foot, about $80 to $160 for the unit. The price often leaves out the foundation, crane, utility connections and permits, so compare full project costs. A site-built ADU costs more, $150 to $250 per square foot for a detached unit, but fits odd lots and custom designs and can match the main house.

Renting an ADU

Rental income is one of the main reasons people build ADUs, and the rules on renting vary. Some cities restrict short-term rentals in ADUs, require owner occupancy on the property, or limit selling an ADU separately from the main house. Check the local rules before designing the unit around a rental plan.

Building codes and energy rules

Every ADU, addition and new home must meet the building code adopted by your state and city, which covers structure, fire safety, egress windows, stairs, insulation and ventilation. Energy codes add requirements for insulation levels, window performance and, in some states, solar panels or electric-ready wiring. In California, new homes and many additions must meet the state's Title 24 energy standards, which require energy calculations as part of the permit set. An architect or designer works these rules into the design so you don't pay for a redesign during plan check.

How to hire an architect

  1. Check the architect's license with your state architecture board.
  2. Review projects similar to yours, especially ADUs or additions if that's your plan.
  3. Ask how the fee is calculated and what each phase includes.
  4. Ask how they estimate construction cost during design, so the design fits your budget.
  5. Get a written agreement that lists the scope, phases, fees and number of revisions.

GOLDGCP's in-house architects design ADUs, additions and remodels, prepare permit sets and coordinate with vetted builders, so the design is priced and buildable before construction begins.

Frequently asked questions

How much does an architect cost for a house?

Usually 5% to 20% of the construction cost, or $5,000 to $60,000 for a typical home design. Drawings for a permit alone cost $2,000 to $20,000.

How much does it cost to build an ADU?

About $100 to $300 per square foot. A 600-square-foot ADU costs roughly $48,000 to $96,000 prefab, $75,000 to $135,000 attached, and $90,000 to $150,000 detached.

How much does a garage conversion ADU cost?

About $50 to $200 per square foot, depending on the condition of the garage and how much work is needed for insulation, plumbing, windows and the foundation.

Do I need an architect for an ADU?

You need permit-ready plans. Many cities accept plans from a qualified designer, and some offer pre-approved ADU plans. Complex sites, hillside lots and some states require a licensed architect or engineer.

How long does it take to get an ADU approved in California?

State law requires cities and counties to approve or deny a complete ADU application within 60 days when there is an existing home on the lot, according to California's Department of Housing and Community Development.

How much do architects charge per hour?

Usually $100 to $250 an hour, with interns and junior staff at $60 to $100 and firm principals up to about $350.

Is an ADU or an addition better?

An ADU suits rental income or a separate space for family. An addition suits growing the main home. Both cost a similar amount per square foot.

Can I build an ADU on my property?

In many US cities, yes, but the rules depend on your zoning, lot size, setbacks and local ADU ordinance. California allows ADUs on most residential lots with an existing or proposed home. Start by checking your city's ADU rules or asking an architect to review your lot before paying for a full design.

How we calculate these prices

GOLDGCP starts from national price ranges for each job, taken from published 2026 cost guides and checked against local price guides where they exist. To get a local price, we multiply the national range by the construction cost factor for the metro from the U.S. Army Corps of Engineers Area Cost Factors (US average = 1.00). Where that table has no entry for a metro, we use the nearest listed location or the state value. For ZIP codes outside the 50 largest metros, the cost estimator uses the state's price level from the Bureau of Economic Analysis Regional Price Parities. Ranges include labor and standard materials but not unusual site conditions, so a written quote after an inspection is always the final price.

Sources

  1. HomeGuide · How much does an architect cost?
  2. HomeGuide · How much does an ADU cost?
  3. California Department of Housing and Community Development
  4. U.S. Army Corps of Engineers
  5. U.S. Bureau of Economic Analysis
GOLDGCP logo mark

About this guide

Written by the GOLDGCP editorial team. Prices come from national cost guides; rules and statistics come from the agencies and reports linked in the text. We update this page when prices or codes change.