Skip to content
Serving homeowners across the US+1 (818) 333-4455WhatsAppClient portalPro Login
Free consultation

Architecture & ADUs guide

California Title 24 Energy Compliance: 2025 Energy Code, CF1R Forms and ECC (HERS) Testing

A plain guide to California's Title 24 Part 6 Energy Code: what changed in 2025, which projects need a Title 24 report, and how field testing works.

By the GOLDGCP editorial team · Updated · 9 min read

Get a free quoteSee prices

A two-story home with solar panels on its roof
Photo: Robert So / Pexels

What Title 24 energy compliance means in California

Quick answer

Title 24, Part 6 is California's Energy Code, and it applies only in California. Under the California Energy Commission's 2025 Energy Code, any building whose permit application is filed on or after January 1, 2026 must comply. New homes, additions and many alterations need a CF1R certificate of compliance with the permit set, and some measures need field testing by a certified rater.

3D illustration: Model of a modern two-story house with a pool
JobUS average (typical range)Typical
Architect fees, ADU (600 sq ft)$4,800–$10,800$7,200
Architect fees, addition (500 sq ft)$3,000–$7,500$5,000
Architect fees, new home (2,500 sq ft)$12,500–$37,500$22,500
3D rendering package$800–$3,200$1,600
Prefab ADU, 600 sq ft, built$48,000–$96,000$72,000
Garage conversion ADU, 600 sq ft$30,000–$120,000$75,000
Attached ADU, 600 sq ft$75,000–$135,000$105,000
Detached ADU, 600 sq ft$90,000–$150,000$120,000
ADU above a garage, 600 sq ft$120,000–$300,000$210,000
Land survey$400–$1,800$1,000

US national averages for 2026, labor and standard materials included, from published cost guides (sources at the end of this page). Local prices differ: see the city table below, or enter your ZIP code in the calculator.

A California rule, not a national one

If you are building outside California, this page is mostly background. Other states write their own energy codes, and the U.S. Department of Energy measures state residential codes against the International Energy Conservation Code (IECC), with ASHRAE Standard 90.1 as the benchmark for commercial buildings. Your local building department will tell you which IECC edition or state version applies. The forms, raters and data registries described below are specific to California.

Inside California, Title 24 of the California Code of Regulations has several parts. Part 6 is the Energy Code, and Part 11 is CALGreen, the green building code. When a plan checker or contractor says "Title 24 report," they almost always mean the Part 6 energy compliance documents.

The 2025 Energy Code: dates that matter

DateWhat happenedSource
September 11, 2024The CEC adopted the 2025 Energy Code amendmentsCEC rulemaking docket 24-BSTD-01
January 1, 2026Permit applications filed on or after this date must comply with the 2025 codeCalifornia Energy Commission
January 1, 2026The Energy Code Compliance (ECC) Program replaced the HERS Program for field testingCalifornia Energy Commission

The trigger is the date the permit application is filed, not the date construction starts. The CEC also says the change is not retroactive. A project permitted under the 2022 code stays under the 2022 code, and its testing follows 2022 rules.

One practical result: a report modeled with 2022 software won't work for an application filed in 2026. Title 24 Calcs, a California report provider, warns that reports prepared with 2022-code software are not valid for permits submitted after January 1, 2026. If your plans sat on a shelf for a year, ask your energy consultant to rerun them.

Which projects need Title 24 compliance

Title 24 Part 6 covers most residential and nonresidential buildings in California. Projects fall into three groups.

New construction

New single-family homes, detached ADUs and multifamily buildings need a full compliance package. For new homes, the CEC says the 2025 code expands the use of heat pumps, encourages electric readiness and strengthens ventilation standards.

Additions

Additions that add conditioned floor area need energy compliance. The CEC's single-family forms split additions by size: CF1R-ADD-01-E covers prescriptive additions of 1,000 square feet or less, and CF1R-NCB-01-E covers newly constructed buildings and additions over 1,000 square feet. Efficiency First California notes that the 2025 code requires load calculations and proper sizing for new heating and cooling systems even in additions.

Alterations

Remodels, window replacements, and HVAC changeouts can trigger the code for the parts being changed. The CEC publishes alteration forms such as CF1R-ALT-02-E for prescriptive alterations to space conditioning systems. Title 24 Calcs lists HVAC replacement, window replacement and lighting changes as common triggers for an alteration report.

The forms: CF1R, CF2R and CF3R

California's single-family compliance documents come in three families. Each one belongs to a different stage of the project.

FormNameWho fills it outWhen
CF1RCertificate of ComplianceEnergy consultant or designerBefore permit, included in the plan set
CF2RCertificate of InstallationInstalling contractorDuring construction
CF3RCertificate of VerificationECC-Rater (formerly HERS rater)After the work, when field testing is required

CF1R: the certificate of compliance

The CF1R is what most people call the Title 24 report. It shows that the design meets the code, either through the prescriptive path or the performance path. It lists insulation levels, window performance, HVAC and water heating equipment, and any measures that need field verification. On 2025 forms, that list is titled "ECC Feature Summary." The CEC says a qualifying permit application should include a registered certificate of compliance.

CF2R: certificates of installation

Contractors complete CF2R forms to confirm what they installed. Examples on the CEC forms page include fenestration installation, insulation installation, roofing ventilation and radiant barriers, and electric-ready requirements.

CF3R: certificates of verification

When a measure needs testing, a certified rater fills out the CF3R after checking the work. Examples include the building air leakage test, quality insulation installation checks at the framing stage, and verification of existing conditions for alterations.

Prescriptive or performance path

There are two main ways to show compliance.

  1. Prescriptive path. You meet a fixed list of requirements for insulation, windows, equipment and so on. It is simple and works well for small additions and alterations that follow the list.
  2. Performance path. A consultant models the building in CEC-approved software and shows that its energy use meets the code budget. It allows trade-offs, such as better windows in exchange for less insulation in one area.

Title 24 Calcs notes that the performance path takes more detailed modeling than the prescriptive path, and that climate zone affects the work. It names Climate Zones 10 and 15 as more demanding than coastal zones.

HERS verification is now the ECC Program

For years, Californians heard "HERS testing" or "HERS verification." On January 1, 2026, the CEC replaced the HERS Program with the Energy Code Compliance (ECC) Program for field verification and diagnostic testing. The CEC describes it as a continuation with a new name and new administration, and the field testing work itself carries over.

How it works, according to the CEC:

  1. The CF1R lists the measures that need field verification and diagnostic testing.
  2. The installing contractor completes the installation forms, and an ECC-Rater tests the listed measures on site.
  3. Results are recorded in an ECC-Provider's data registry.
  4. If a test fails, the contractor must fix the feature or system until it passes.
  5. The building department checks the registered documents before it closes the permit.

There is an exception for urgent alterations, such as an HVAC changeout when a system fails. In that case the certificates can be registered after work begins, but before the permit is finalized.

Raters who held HERS certifications are recognized as ECC-Raters, and many businesses still use "HERS" in their names. The whole-house HERS rating, a separate home energy score, stays in the HERS program. Title 24 also requires completed documents to be left in the home for the owner.

Key 2025 changes for single-family projects

Efficiency First California's contractor guide summarizes the changes most likely to affect a house project:

  • Load calculations and proper equipment sizing for heating and cooling, even for new systems in additions
  • Limits on backup electric resistance heat in heat pumps, with thermostat settings that block it above 35°F outdoors
  • Heat pump water heaters as the baseline, even in additions, while gas water heaters can still replace existing gas units in alterations
  • Exterior wall insulation of at least R-15 in 2x4 walls or R-21 in 2x6 walls, with existing 2x4 walls holding at least R-11 left alone unless the project alters them
  • An R-38 option for cathedral ceilings in all climate zones, or the performance path
  • Stricter window U-factor and solar heat gain coefficient values in almost every climate zone, including like-for-like replacements

These items change what your architect specifies. A window package or water heater chosen under the 2022 rules may not pass under the 2025 rules.

What a Title 24 report costs

Published prices are scarce. Title 24 Calcs lists residential new construction and ADU reports starting at $250, with additions, alterations and commercial work quoted by scope. Its price includes the CF1R, registration with the data registry, plan-sized PDFs and revisions for plan check comments, and most residential reports take 1 to 2 business days once plans are complete. The same provider says registration fees can add $50 to $150 when another provider doesn't include them. Treat these as one company's prices, not a statewide average.

A report price may not cover the ECC-Rater's site visits for field testing. Ask for that quote along with the report, so the full compliance cost is in your budget.

Questions to ask before you hire someone for the report:

  • Is the software updated for the 2025 Energy Code?
  • Is data registry registration included?
  • Are revisions for plan check comments included?
  • Which measures will need ECC testing, and who arranges the rater?

You can estimate overall design fees, including energy work, with the calculator below.

How Title 24 fits the rest of your permit set

The energy forms are one part of the drawings the city reviews. Our page on permit drawings covers the rest of the set and how plan check works. If the project also changes the structure, see structural coordination. For project-specific guidance, read about ADU design, additions and remodels, residential design or commercial design, or return to the architecture overview.

Find a California architect near you

Enter your ZIP code to see local design prices and get matched with design help that prepares energy-compliant plans.

How GOLDGCP works

GOLDGCP's in-house architects prepare permit sets, and for California projects they coordinate the Title 24 energy documents with the drawings so the window, insulation and equipment specs match on every sheet. Prices are shown by ZIP code before anyone visits. When you're ready to build, GOLDGCP matches you with 3 vetted, licensed contractors who pass six-step vetting: state license verification, insurance check, background and business check, portfolio review, client reference calls, and onboarding with a quality score.

Payment is set up in milestones, and each one after you approve that stage. Plans, forms and test results are kept together in the client portal. GOLDGCP serves all 50 states, so projects outside California follow the energy code your state has adopted. See design services for more.

Frequently asked questions

Is Title 24 required outside California?

No. Title 24 is the California Building Standards Code, and Part 6 is California's Energy Code. Other states adopt their own energy codes, and the U.S. Department of Energy benchmarks state residential codes against the International Energy Conservation Code (IECC). Ask your local building department which edition applies.

When does the 2025 California Energy Code take effect?

The California Energy Commission says buildings whose permit applications are filed on or after January 1, 2026 must comply with the 2025 Energy Code. Projects permitted earlier stay under the code that was in effect when they were permitted.

What is a CF1R form?

The CF1R is the Certificate of Compliance. It shows that a design meets the Energy Code, through either the prescriptive or performance path, and lists any measures that need field testing. It goes into the permit set, and a qualifying application should include a registered CF1R.

Is HERS testing still required?

The testing still happens, but the program has a new name. On January 1, 2026, the Energy Code Compliance (ECC) Program replaced the HERS Program for field verification. Former HERS raters are recognized as ECC-Raters, and the CEC says prior field testing services continue without disruption.

Does a room addition need a Title 24 report?

Yes, an addition that adds conditioned space needs energy compliance documents. The CEC has separate prescriptive forms for additions of 1,000 square feet or less and for larger additions. Under the 2025 code, new heating and cooling systems in additions also need load calculations and proper sizing.

How much does a Title 24 report cost?

Few providers publish prices. One California provider, Title 24 Calcs, lists new home and ADU reports from $250, with additions and alterations quoted by scope. Ask whether ECC-Rater field testing is included, and get both prices before you start.

Do window replacements trigger Title 24?

They can. The 2025 code tightened window U-factor and solar heat gain limits in almost every climate zone, including like-for-like replacements, according to Efficiency First California. Check with your building department and ask your window supplier for products rated to the 2025 values.

How we calculate these prices

GOLDGCP starts from national price ranges for each job, taken from published 2026 cost guides and checked against local price guides where they exist. To get a local price, we multiply the national range by the construction cost factor for the metro from the U.S. Army Corps of Engineers Area Cost Factors (US average = 1.00). For ZIP codes outside the 50 largest metros, the calculator uses the state's price level from the Bureau of Economic Analysis Regional Price Parities. Ranges include labor and standard materials but not unusual site conditions, so a written quote after an inspection is always the final price.

Sources

  1. 2025 Building Energy Efficiency Standards · California Energy Commission
  2. Energy Code Compliance Program · California Energy Commission
  3. 2025 Energy Code Compliance Documents: Forms for Single-Family Buildings · California Energy Commission
  4. 2025 Energy Code Rulemaking, Updated Informative Digest (Docket 24-BSTD-01) · California Energy Commission
  5. Contractor's Guide to the 2025 Single-Family Energy Code (Title 24, Part 6) · Efficiency First California
  6. Title 24 Report Pricing and Cost Guide · Title 24 Calcs
  7. State Energy Code Methodology · U.S. Department of Energy, Building Energy Codes Program
GOLDGCP logo mark

About this guide

Written by the GOLDGCP editorial team. Prices come from national cost guides; rules and statistics come from the agencies and reports linked in the text. We update this page when prices or codes change.

Keep exploring

More architecture & adus guides

Explore GOLDGCP

Every home service, one standard